Tim Craw

With 45 years of construction experience in nearly every industry segment, Tim Craw joined us in 2024. He is responsible for expanding the company’s footprint throughout the Atlantic states. Prior to joining us, Tim was a Union Business Agent and Building Trades President, a position that provides him with unique insights and leadership experience. A graduate of the U.S. Army Engineer School, Tim served six years in the U.S. Army. He lives in Pittsfield with his wife, and they have four children and two grandchildren. When not working, Tim loves to travel throughout the Americas and Europe.

Scroll to Top

Baystate Behavioral Health Hospital, Holyoke, MA
General Contractor: DPR Construction
Square Feet: 122,000
Services Provided: Cold-formed metal framing, rough carpentry/sheathing, gypsum wall assemblies, doors and hardware, toilet partitions and accessories, gypsum board.

As the largest construction project in Holyoke at the time, the Baystate Behavioral Health Hospital campus was designed to expand access to critical mental health services across Western Massachusetts. The facility includes three buildings: a four-story, 95,000 sq ft inpatient center, a 23,000 sq ft continuing care unit and a 4,000 sq ft therapy gym—all designed to support healing and long-term recovery.

Our team was proud to support this essential healthcare project with a wide range of trade services. We provided cold-formed metal framing, rough carpentry and sheathing, gypsum wall assemblies and full gypsum board installation. Our scope also included doors and hardware, as well as toilet partitions and accessories. Through precise, high-quality interior systems work, we helped build a safe, functional and welcoming environment for patients and providers alike.