Mark Chevalier

With three decades in the construction industry, our safety manager, Mark Chevalier, has been with us since 2000. During that time, he has been a taping supervisor, a foreman, a general foreman and a project manager. Mark strives to provide a safe work environment for all employees by delivering training and enforcing safety protocols. He is a member of the American Society of Safety Professionals (ASSP) and holds numerous certifications to back it up. Married with two children, he has worked on many Habitat for Humanity homes as well as three “Extreme Makeover: Home Edition” houses. Mark enjoys fishing in his off time and sets up a yearly fishing trip chartering up to eight boats for employees of PDC.

Scroll to Top

Baystate Behavioral Health Hospital, Holyoke, MA
General Contractor: DPR Construction
Square Feet: 122,000
Services Provided: Cold-formed metal framing, rough carpentry/sheathing, gypsum wall assemblies, doors and hardware, toilet partitions and accessories, gypsum board.

As the largest construction project in Holyoke at the time, the Baystate Behavioral Health Hospital campus was designed to expand access to critical mental health services across Western Massachusetts. The facility includes three buildings: a four-story, 95,000 sq ft inpatient center, a 23,000 sq ft continuing care unit and a 4,000 sq ft therapy gym—all designed to support healing and long-term recovery.

Our team was proud to support this essential healthcare project with a wide range of trade services. We provided cold-formed metal framing, rough carpentry and sheathing, gypsum wall assemblies and full gypsum board installation. Our scope also included doors and hardware, as well as toilet partitions and accessories. Through precise, high-quality interior systems work, we helped build a safe, functional and welcoming environment for patients and providers alike.